Metpro employees have many years' experience of managing large, technically complex and demanding projects worldwide. We pride ourselves in being able to supply a large variety of steel products and to manage the entire project supply chain in order to ensure that project timelines and budgets are maintained. Examples are shown below;
• Petroleum Refinery: India • Major UK Port Project • Hydro Power Plant: India • Alumina Refinery: Guinea, West Africa • Large Diameter Gas Pipeline: Iran • High Rise Building: Abu Dhabi • Offshore Platform: India
|
|
Petroleum Refinery: India • 90000 tonnes of Mild Steel Tank Plate for main Storage Tanks • 17000 tonnes of A537-1 for Pressure Vessels & Spherical Tanks • 7000 tonnes of Process Pipe • 14 managed shipments from 5 different load ports • Multiple Pre-Production Meetings to ensure quality and reliability of supply • Material supplied from China, Korea, Romania, Ukraine and West European sources • Material supplied fully in line with project timescale (back to top) |
|
|
Major UK Port Project • Supply of approximately 20,000 tonnes of large diameter tubular piles • Main piles supplied in lengths up to 40 metres, 2.5m diameter • Material sourced from three European mills • Main Quay Wall Piles supplied with fabricated clutches in order to interlock with each other • Piles delivered in line with project schedule over an 18 month period from contract signature • 22 phased shipments direct to project site (back to top) |
|
|
Hydro Power Plant: India • Supply of approx 6000 tonnes of High Strength Plate • Technically demanding material specification • Quenched & Tempered plates for Penstock Tunnels • Multiple pre-production meetings to agree full specification and ensure quality performance • Mutliple shipments from Japanese ports to project site. • ITP's/MQP's, Full TPI inspection service and logistics management arranged by Metpro staff. (back to top) |
|
|
Alumina Refinery: Guinea, West Africa • 15000 metric tonnes of Bearing Piles for a large civil engineering projects • Piles required for ground stabilisation to support refinery superstructure • Material on the critical path, quality and delivery performance essential to avoid project delays • Worldwide search for most appropriate offer • First shipment made within 8 weeks of signing the contract • Multiple shipments, all delivered on time and in full to project discharge port • Flexible contract terms negotiated with EPC client • Piles supplied from Japan in long lengths of 18m (back to top) |
|
|
Large Diameter Gas Pipeline: Iran • 80000 tonnes of 56" Diameter API 5L Grade X70 LSAW Pipes • 30000 tonnes of 30"Diameter API 5L Grade X70 LSAW Pipes • Technical approval of the supply Mill • First major Iranian contract for producing Mill • Project managed complete supply including quality assurance and delivery performance • Multiple shipments, all delivered on time and in full • Flexible contract terms negotiated with end client • Flexible payment terms negotiated and agreed (back to top) |
|
|
High Rise Building: Abu Dhabi • 2300 tonnes of Steel Plates fabricated into castellated beams • Sourced plates from Ukraine in tailor made widths and lengths to reduce waste • Project-managed timely deliveries over 2 months • Material supplied with no negative thickness tolerance and controlled flatness (back to top) |
|
|
Offshore Platform: India • Mixed complex package covering supply of Sections, Angles, RHS, Plates and Built-Up Box Sections • Project owner - Indian Public Sector Oil & Gas company • EPC/fabricators joint venture located in India and Indonesia • Engineering based on stringent specifications • Special production slots managed with various mills • Fabrication of Box Sections arranged with Third Party Inspection • Fast-track stock supplies managed and coordinated from Abu Dhabi, USA and Singapore • Requirement for upgrading/re-testing of stock material to meet project specifications (back to top) | |
| |
|
|